Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13621913

- Product Categories
- Friendly Links
Information Name: | Dongfeng 6 square asphalt distributor Kunming asphalt distributor for sale |
Published: | 2014-12-17 |
Validity: | 30000 |
Specifications: | |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Asphalt distributor is the main equipment highways, urban roads, airport and port construction, and in the use of asphalt penetration method, laying asphalt layer, surface Treatment Act or the conservation of asphalt pavement construction asphalt road diesel, used to transport and spraying liquid asphalt (including hot, emulsified asphalt and diesel), but also to place the loose pieces of asphalt binder soil supply, construction of roads or road base asphalt stabilized soil. Asphalt distributor is a black road construction machinery, which is the main equipment highways, urban roads, airports and ports construction. In the use of asphalt penetration method, when laying asphalt surface layer of asphalt pavement construction Treatment Act or the conservation of residual asphalt or pavement, asphalt distributor can be used to transport and spraying liquid asphalt (including hot asphalt, emulsified asphalt and residual oil): In addition, it can be broken loose soil to place the supply of asphalt binder, the construction of roads or road base asphalt stabilized soil. Construction of high-grade asphalt pavement layer Bitumen waterproof layer bonding layer spraying, road maintenance in the asphalt overlay, spray, can be used to implement a layered anti-jamming capability paving work equipment. Spraying through the layer of oil intelligent asphalt distributor for construction of highway asphalt pavement layer and waterproof layer, the adhesive layer. Can spraying high viscosity modified asphalt, heavy traffic asphalt, modified emulsified asphalt, emulsified asphalt. Can also be used to implement a hierarchical process paving county and township road construction the oil. The spreaders by car chassis, asphalt tank, asphalt pumping and spraying systems, oil heating systems, hydraulic systems, combustion systems, control systems, pneumatic systems, operating platforms composition. [Dongfeng DLK asphalt distributor configuration] engine CY4102-CE4C wheelbase 3800mm Vehicle Dimensions 7380 * 2280 * 2550mm 2690kg curb weight of 5850kg rated the quality of the tank volume 6m3 192 front axle beam rear axle 5T 2.5T 5-speed gearbox front Single-row vehicle features can be turned tire 7.50-16 direction of power, breathe brake performance asphalt distributor [] 1) computer-controlled asphalt distributor, various spraying operation requirements can be completed in the cab; reduce the labor intensity, saving labor costs; 2) spraying width can be adjusted, each nozzle can achieve individually controlled, and can be any combination, at any time to adjust according to the actual needs of spraying width, maximum spray width of up to 6m; 3) a unique nozzle design Three overlapping spray can; spray volume without affecting the speed change (patent), high precision spraying; 4) After several projects at home and abroad under a variety of environmental / construction verification and strict precision testing to ensure that each nozzle spraying consistency, stable performance, reliable. 5) The entire piping, tanks were individually heated, energy efficient; 6) HTF asphalt circulation pump and nozzle implementation of comprehensive heating, insulation, ensuring smooth asphalt spray ChengLi asphalt distributor, after spraying ended, asphalt without diesel pump and nozzles clean, environmentally friendly and efficient; 7) control system uses a modular design, and a pavement asphalt spreaders backup system to ensure that when the master fails, you can still implement automatic sprinkler; 8) with a handheld gun easy to use, can be on the corner and special parts for local spray; 9) use low-speed, large displacement asphalt pump can spray high viscosity rubber modified asphalt; 10) inside the tank is equipped with two powerful stirring device, can fully stirred tank, avoid precipitation and segregation, making spraying uniform, reliable quality; 11) is equipped with two sets of heating systems, heating and powerful, able to meet the temperature requirements of various asphalt distributor, and has excellent insulation properties, the average cooling ≤1 ℃ / h; [works] asphalt bitumen pump spray device consists of bitumen pipeline work, handgun, after the nozzle and nozzle after lifting devices and other components. Its function is to pump the liquid asphalt bitumen by certain pressure through the nozzle pitch line to a post or handgun, spraying operation. An asphalt bitumen pump by an external gear pump housing, cover, deep groove ball bearings and seals and other components. When the gear is rotated, the original gear meshing gradually disengage from small and large gaps between teeth, the formation of negative pressure suction, when the teeth are filled with liquid asphalt, and rotation together along with the gear pump casing, was taken into the oil pressure chamber, when the gear re-engagement, the teeth pitch is extruded at a constant discharge pressure to the pump. Second, the asphalt bitumen pipeline work, including the work of the pipeline after the tank piping and tank lines. Pipe inside the tank, including straw, circulation pipe, valve tube. Cans out of the pipeline, including asphalt pump tube, circulation pipe and tubing connected to the spray device. Since the beginning of the asphalt pump inlet suction (suction tank for asphalt) and external suction (for absorbing external liquid asphalt), bitumen pump outlet into three, all the way to a strong discharge port (through asphalt bitumen tank pump discharge tank mandatory or for bitumen switch), all the way to the additional circulation tube (for stirring the asphalt, making the asphalt tank temperature uniformity), the rest of the way to the rear nozzle or handgun (for spraying operations). Third, the handgun handgun from the nozzle, handgun rod, ball valves, threaded fittings and hoses, mainly for small-scale construction and repair work. Radius of gyration of the hose is 7 m. Fourth, after the spout nozzle includes a main nozzle, auxiliary nozzle, nozzles, end caps, joints, O-rings, nozzle swivel joints, fittings and after lancer hoses. Mainly used for spraying liquid asphalt large-scale construction. After basic nozzle spray width of 2 meters, by expanding the auxiliary nozzle, can be composed of 2 m, 3 m and 4 m, such as spray rate of five, after the nozzle after lifting device nozzle elevating swing swing device includes a cylinder, sleeve rod, lift lever arm, slotted nuts, nozzle connecting rod and pneumatic control means. After lifting spray nozzle swing after lifting device is mainly used to adjust the height and after spraying nozzle move around according to needs of the construction. After lifting the nozzle from the toggle switch to control a solenoid valve controlling the telescopic cylinder, in order to achieve the vertical movement after the nozzle, and the requirements of the construction according to the height is fixed by the height of the chain. After nozzle lifting stroke of 25 cm. You can also move the nozzle after each about 15 cm according to the construction needs. Six, working gas manifold road work to include air compressors, bridge device, reservoir pump, valve, drain valve, check valve, pressure gauge, solenoid valves, control valves, filters, plastic hose and brass, etc. . Mainly to provide compressed air cylinder moves and cleaning. Pneumatic air clutch to get from the car. Seven, the compressed air cleaning system for cleaning and washing systems clean diesel. Compressed air is mainly used for asphalt pipeline, after the nozzle and hand guns. Diesel is mainly used for cleaning residual bitumen asphalt pump, in order to avoid a lot of condensation in the asphalt bitumen pump, causing the asphalt pump start-up difficulties. After cleaning diesel can be discharged through the discharge port or strong hand gun. Eight, because of the car's gearbox reducer at maximum reduction ratio is still unable to meet the speed requirements of construction sometimes, so the car is equipped with a reduction gear transmission system, to slow down when driving speed of construction. Direct gear reducer and downshift points directly stalls mainly for automobile traffic in peacetime; downshift is mainly used for construction work, in order to meet the speed requirements of the construction, when a small amount of spraying will be used directly to file. Nine, heating means for heating apparatus includes a burner, fuel lines, fuel tank, oil filter, U-shaped heat pipe, exhaust pipes and the burner controller. Mainly used for heating asphalt temperature drops insulation to ensure the construction of the required temperature. Flame burner produced by direct heating U-shaped heat pipe, the heat generated by the combustion tube is passed to the asphalt, exhaust gases discharged through the exhaust pipe U-heated. [Note] 1, spreaders when a job is completed or converted construction sites, asphalt pump and piping must be cleaned, otherwise the next time will not work. 2, spreaders before spraying, be sure to check the valve position is correct. Join hot asphalt bitumen tank must reach 160 ~ 180 ℃ operating temperature, long-distance transport or long working hours, you can use a heating device insulation, but not as a melting oil furnace. 3, asphalt tank can not be filled too full, the fuel filler cap must be tightly closed, during transport to prevent asphalt overflow. 4, when the tank with a burner for heating asphalt, bitumen must exceed the height of the plane of the combustion chamber, the combustion chamber would otherwise be burned. 5, if the asphalt pump and pipes are clogged bitumen solidification can not forcibly turn the pump, use a blowtorch baking, baking should avoid direct ball and rubber parts. 6, at the beginning spraying asphalt, to be a slow start, the car remains at low speed. Not pedal to the metal to prevent clutch, pumps and other components damaged asphalt. 7, this car has around two consoles, when using the front console, the need to switch to the front of the control, then the console can control nozzle lift. When using the console later, the need to switch back to position control, the console has no effect at this time before, in addition to various small nozzle after the switch can use the console to open and close. 8, a day job is completed, if the residual bitumen must replace asphalt tank, otherwise it will not work in the tank next solidification. If the car or work equipment failure, determine a short time can not be repaired, it must be all exhausted asphalt tank. [Step] car Hubei Cheng Li Special Automobile Co., Ltd. can be requested by the user according to the actual needs of the user, for each user to create high-quality, personalized special vehicles, new and old customers come to visit order and bring their own chassis modification! ? The first step: the car to discuss: National Sales Hotline: 151-7279-7836 Contact by phone or site visits to discuss the vehicle model, price and related requirements. ? Step Two: contract: the two sides signed a contract vehicle sales contract and prepaid deposit (fax contracts, field contract can be). ? The third step: for production: our company according to contract requirements, arrange the workshop production. ? Step Four: Delivery: Vehicle delivery and acceptance, payment of the balance of the vehicle, complete the relevant formalities. Delivery Method: Customers can put the vehicle can also be negotiated by my company to arrange delivery vehicles and related costs more detailed agreement setting cars process, please contact us.! A year or thirty thousand kilometers [service] Free after sales service, more than a year, and only pay fitting costs. Dongfeng ☆ ☆ Cheng Li Special Purpose Vehicle Co., Ltd. Address: Suizhou southern suburbs ChengLi Automobile Industry Park (10 Station Road car station to get off the bus terminus) ☆ National Sales Hotline: 151-7279- 7836 |
Admin>>>
You are the 2010 visitor
Copyright © GuangDong ICP No. 10089450, Hubei Cheng Li Special Purpose Vehicle Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 2010 visitor
Copyright © GuangDong ICP No. 10089450, Hubei Cheng Li Special Purpose Vehicle Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility